Explore the 10 cheapest charging stations and compare prices by connector type.
Use this live list to compare the ten cheapest charging stations in Kingdom Hall of Jehovah's Witneses. Prices update as you switch between Type 2, CCS, and Tesla speeds, so you can spot the best connector before leaving home.
Tap a station to see its ranking, price score, and neighborhood context to decide whether a tiny detour is worth it.
Before you drive, download the Seety app to launch a charging session from your phone, follow community alerts, and keep monitoring prices on the go.
Charging speed
Slow · 0–49 kW
EnergyVision
Slow · up to 7 kWPrice
0.32 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.40 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.40 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.40 €/kWh
Connectors on site
CC2.0 - CC809 - 1150 - Kerkstraat 64
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
EnergyVision
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
EnergyVision
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
DRIVECO
Slow · up to 22 kWPrice
0.52 €/kWh
Connectors on site
After charging parking fee
0.23 €/min after charging

Optimile
Slow · up to 7 kWPrice
0.53 €/kWh
Connectors on site
Unlock fee
+ 0.70 € unlock fee

TotalEnergies
Slow · up to 22 kWPrice
0.56 €/kWh
Connectors on site
Kraainem - Koningin Astridlaan 427
Slow · up to 22 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 22 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 22 kWPrice
0.58 €/kWh
Connectors on site
Unlock fee
+ 2.89 € unlock fee

TotalEnergies
Slow · up to 22 kWPrice
0.58 €/kWh
Connectors on site
Unlock fee
+ 2.89 € unlock fee

Lidl
Slow · up to 22 kWPrice
0.58 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.58 €/kWh
Connectors on site
Unlock fee
+ 2.89 € unlock fee
BEL, Kraainem, Koningin Astridlaan 422
Slow · up to 22 kWPrice
0.62 €/kWh
Connectors on site

Optimile
Slow · up to 22 kWPrice
0.64 €/kWh
Connectors on site

Threeforce
Slow · up to 22 kWPrice
0.67 €/kWh
Connectors on site
Price per minute
0.01 €/min
Unlock fee
+ 0.35 € unlock fee
After charging parking fee
0.01 €/min after charging
Parking intel
Jump into the dedicated parking rules page to see live zones, public parkings and payment flows before you arrive.
