Compare EV charging prices in Cauter, switch between connector types, and spot the best options before you plug in.
Use this live list to compare 20 charging stations in and around Cauter. Prices update as you switch between Type 2, CCS, and Tesla connectors, so you can spot the best option before leaving home.
Tap a station to see its ranking, price score, and neighborhood context to decide whether a tiny detour is worth it.
Before you drive, download the Seety app to launch a charging session from your phone, follow community alerts, and keep monitoring prices on the go.
Charging speed
Slow · 0–49 kW
1180 - CC274 - avenue Adolphe Wansart - Cambio
Slow · up to 7 kWPrice
0.32 €/kWh
Connectors on site

CC2.0 - CC868 - 1180 - Ilya Prigoginelaan 9
Slow · up to 7 kWPrice
0.43 €/kWh
Connectors on site
CC2.0 - CC867 - 1180 - Achille Reisdorfflaan 5
Slow · up to 7 kWPrice
0.43 €/kWh
Connectors on site
CC2.0 - CC900 - 1180 - Stallestraat face 67
Slow · up to 7 kWPrice
0.43 €/kWh
Connectors on site
CC2.0 - CC841 - 1180 - Rue de la Magnanerie 1A
Slow · up to 7 kWPrice
0.43 €/kWh
Connectors on site
CC2.0 - CC869 - 1180 - Alsembergsesteenweg 962
Slow · up to 7 kWPrice
0.43 €/kWh
Connectors on site

Threeforce
Slow · up to 7 kWPrice
0.46 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site
PIGNOL Bérénice
Slow · up to 22 kWPrice
0.55 €/kWh
Connectors on site
Unlock fee
+ 0.70 € unlock fee

TotalEnergies
Slow · up to 22 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 22 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.56 €/kWh
Connectors on site

diego Luxembourg
Slow · up to 22 kWPrice
0.63 €/kWh
Connectors on site

diego Luxembourg
Slow · up to 22 kWPrice
0.63 €/kWh
Connectors on site

Optimile
Slow · up to 22 kWPrice
0.64 €/kWh
Connectors on site

Threeforce
Slow · up to 22 kWPrice
0.84 €/kWh
Connectors on site
Parking intel
Jump into the dedicated parking rules page to see live zones, public parkings and payment flows before you arrive.
