Compare EV charging prices in Rue Robert Thoreau - Robert Thoreaustraat, switch between connector types, and spot the best options before you plug in.
Use this live list to compare 20 charging stations in and around Rue Robert Thoreau - Robert Thoreaustraat. Prices update as you switch between Type 2, CCS, and Tesla connectors, so you can spot the best option before leaving home.
Tap a station to see its ranking, price score, and neighborhood context to decide whether a tiny detour is worth it.
Before you drive, download the Seety app to launch a charging session from your phone, follow community alerts, and keep monitoring prices on the go.
Charging speed
Slow · 0–49 kW
EnergyVision
Slow · up to 7 kWPrice
0.32 €/kWh
Connectors on site

1200 - CC129 - Gouddallaan
Slow · up to 7 kWPrice
0.32 €/kWh
Connectors on site
EnergyVision
Slow · up to 7 kWPrice
0.32 €/kWh
Connectors on site
EnergyVision
Slow · up to 7 kWPrice
0.32 €/kWh
Connectors on site

Threeforce
Slow · up to 22 kWPrice
0.40 €/kWh
Connectors on site
CC2.0 - CC795 - 1150 - Kapitein Piretlaan 25
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
CC2.0 - CC764 - 1200 - Rue de la Cambre 144
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
EnergyVision
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
CC2.0 - CC777 - 1150 - Av. Mostinck 4
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
CC2.0 - CC727 - 1200 - Avenue J.P. Rullens 29
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site
EnergyVision
Slow · up to 7 kWPrice
0.42 €/kWh
Connectors on site

TotalEnergies
Slow · up to 22 kWPrice
0.46 €/kWh
Connectors on site
Unlock fee
+ 1.05 € unlock fee

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 22 kWPrice
0.47 €/kWh
Connectors on site

Threeforce
Slow · up to 11 kWPrice
0.47 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.56 €/kWh
Connectors on site

TotalEnergies
Slow · up to 7 kWPrice
0.56 €/kWh
Connectors on site
Parking intel
Jump into the dedicated parking rules page to see live zones, public parkings and payment flows before you arrive.
