Compare EV charging prices in Sint-Nicolaaskerk, switch between connector types, and spot the best options before you plug in.
Use this live list to compare 19 charging stations in and around Sint-Nicolaaskerk. Prices update as you switch between Type 2, CCS, and Tesla connectors, so you can spot the best option before leaving home.
Tap a station to see its ranking, price score, and neighborhood context to decide whether a tiny detour is worth it.
Before you drive, download the Seety app to launch a charging session from your phone, follow community alerts, and keep monitoring prices on the go.
Charging speed
Slow · 0–49 kW
EnergyVision
Slow · up to 22 kWPrice
0.37 €/kWh
Connectors on site
Greenflux
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
ENGIE Vianeo - Sint-Niklaas , Walburgstraat 7
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
ENGIE Vianeo - Sint-Niklaas , Dr. Verdurmenstraat 27
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
ENGIE Vianeo - Sint-Niklaas , Kokkelbeekplein 1
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
ENGIE Vianeo - Sint-Niklaas , Hemelaerstraat 11
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
Greenflux
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site

Allego
Slow · up to 11 kWPrice
0.51 €/kWh
Connectors on site
Greenflux
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
ENGIE Vianeo - Sint-Niklaas , Zwijgershoek 27
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
ENGIE Vianeo - Sint-Niklaas , Regentieplein 4
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
Greenflux
Slow · up to 22 kWPrice
0.51 €/kWh
Connectors on site
E-Flux
Slow · up to 11 kWPrice
0.52 €/kWh
Connectors on site
Monta
Slow · up to 22 kWPrice
0.52 €/kWh
Connectors on site
BEL, Sint-Niklaas, August Nobelsstraat 7
Slow · up to 11 kWPrice
0.53 €/kWh
Connectors on site
Blink Charging
Slow · up to 22 kWPrice
0.55 €/kWh
Connectors on site
Unlock fee
+ 0.23 € unlock fee
After charging parking fee
0.03 €/min after charging
Sint-Niklaas - Collegestraat - EVA
Slow · up to 25 kWPrice
0.58 €/kWh
Connectors on site
Unlock fee
+ 0.23 € unlock fee
After charging parking fee
0.03 €/min after charging
Onze-Lieve-Vrouwplein 31, Sint-Niklaas
Slow · up to 11 kWPrice
0.73 €/kWh
Connectors on site

Threeforce
Slow · up to 22 kWPrice
0.77 €/kWh
Connectors on site
Parking intel
Jump into the dedicated parking rules page to see live zones, public parkings and payment flows before you arrive.
